|
3D Model |
Overlay |
Plan View |
Column 1 PCB |
|
|
|
Column 2 PCB |
|
|
|
Back PCB |
|
|
|
Constructors should refer to the Component Overlays along with,
the Bill of Materials for the current value of all components, and
the General Construction Notes for general PCB assembly guidelines.
- Assemble the 2x Jack Carrier boards
- Assemble the Switch Carrier board
- Fit the LED lens to the front panel
- Fit all components to their respective PCBs except for the sub-assemblies and LED
- Mount the sub-assemblies on to the Column 1 PCB but do not solder
- Offer the Column 1 assembly up to the front panel and secure using the supplied nuts and washers
- Solder the sub-assemblies in to position
- Some builders may wish to temporarily remove the Column 1 assembly to allow easier access to soldering the LED in the next steps
- Mount the LED on to the Column 2 assembly but do not solder
- Offer the Column 2 assembly up to the front panel and secure using the supplied nuts
- Position the LED in to its lens mount and then solder in to place
- Mount the Back PCB assembly ensuring that the IDC connectors are correctly aligned