Build Guide - Calibration
Set JP1 to ‘+’ and JP2 to ‘0’
Set P101 to its mid-position
Set [RISE] and [FALL] to ‘5’
Patch [END] to [TRIGGER]
Monitor the output [DC]
Adjust P101 until the output is 5Vp-p
PCB Assembly
Top Of Page
Email:
elby-designs@bigpond.com
© Copyright 2000. All rights reserved.
Revi
sed: December 7, 2023