Build Guide - PCB Assembly
 
3D Model
Overlay
Plan View
CGS733B PCB

Constructors should refer to the Component Overlays along with,
the Bill of Materials for the current value of all components, and
the General Construction Notes for general PCB assembly guidelines.

  1. Assemble the Switch Carrier board
  2. Fit all components except for the Switch Carrier sub-assembly and LED
  3. Mount the Switch Carrier sub-assembly to the CGS733B PCB but do not solder
  4. Offer the assembly up to the front panel and secure using the supplied nuts and washers
  5. Solder the Switch Carrier sub-assembly assembly in to place
  6. Install the LED and solder in to place
Email:  elby-designs@bigpond.com
© Copyright 2000. All rights reserved.     Revised: October 26, 2022