Build Guide - Calibration

    1. Patch a 500Hz 2VDC p-p square wave in to [CV IN]
    2. Set [CV IN] to maximum
    3. Monitor [OUT]
    4. Adjust P102 for minimum breakthrough of the square wave
Email:  elby-designs@bigpond.com
© Copyright 2000. All rights reserved.     Revised: January 16, 2023