Build Guide - Calibration

  1. Set [GAIN] to maximum
  2. Set P101 to its mid-position
  3. Set P201 fully counter-clockwise
  4. Patch 3VDC in to [LOG] and [DC IN]
  5. Monitor [OUT] with a multimeter
  6. Adjust P103 for a reading of 6VDC
  7. Disconnect the patch to [LOG]
  8. Adjust P101 for a reading of 3VDC
  9. Repeat steps (6) to (8) to ensure consistent results
  10. Disconnect the patch to [DC IN]
  11. Patch a 500Hz 5VDC p-p sawtooth in to [LIN]
  12. Adjust P201 for minimum breakthrough
Email:  elby-designs@bigpond.com
© Copyright 2000. All rights reserved.     Revised: August 13, 2023