Build Guide - Calibration

 

  1. Set all pot controls to their minimum position except [IN 1 LEVEL] which should be set to it's maximum position
  2. Adjust P201 fully anti-clockwise
  3. Select [CLEAN]
  4. Apply a 200Hz 5VAC triangle to [IN 1]
  5. Monitor [OUT]
  6. Adjust P201 until you cannot hear the signal. Adjust a further 1/2-turn
  7. Set [INITIAL GAIN] to maximum
  8. Adjust P301 for an output of 5Vp-p.

 

Email:  elby-designs@bigpond.com
© Copyright 2000. All rights reserved.     Revised: September 12, 2023